The 160KVA/200KVA power transformer is specifically designed for industrial and commercial distribution systems, featuring a full copper winding structure for efficient energy transfer with a conversion efficiency of over 98%. The product includes intelligent temperature control protection, enabling stable operation in a wide temperature range of -25°C to 45°C, making it particularly suitable for manufacturing plants, commercial complexes, and renewable energy stations. Through modular design, space utilization is optimized, and it comes equipped with anti-vibration brackets and an IP55 protection rating, effectively adapting to complex outdoor environments. It strictly adheres to the IEC60076 international standard and supports customized voltage ratio configurations (such as 380V/220V, 415V/240V, etc.), undergoing a 72-hour full-load aging test before leaving the factory.
video
Products parameter
|
Rated Capacity |
High Voltage |
High Voltage Tap Range |
Low Voltage |
No-load Loss (W) |
Load Loss (W) |
No-load Current (%) |
Short-circuit Impedance (%) |
|
50 |
6 6.3 10 10.5 11 |
±5% (±2×2.5) |
0.4 |
100 |
910/870 |
0.25 |
4.0 |
|
80 |
130 |
1310/1250 |
0.22 |
||||
|
100 |
150 |
1580/1500 |
0.21 |
||||
|
125 |
170 |
1890/1800 |
0.20 |
||||
|
160 |
200 |
2310/2200 |
0.19 |
||||
|
200 |
240 |
2730/2600 |
0.18 |
||||
|
250 |
290 |
3200/3050 |
0.17 |
||||
|
315 |
340 |
3830/3650 |
0.16 |
||||
|
400 |
410 |
4520/4300 |
0.16 |
||||
|
500 |
490 |
5410/5150 |
0.15 |
||||
|
630 |
580 |
6200 |
0.15 |
4.5 |
|||
|
800 |
700 |
7500 |
0.14 |
||||
|
1000 |
830 |
10300 |
0.13 |
||||
|
1250 |
980 |
12000 |
0.12 |
||||
|
1600 |
1180 |
14500 |
0.11 |
Power Transformer Products Description
Product Advantages of Power Transformer
1.Highly Efficient and Energy-Saving Design
The Power Transformer adopts a full-copper winding structure, significantly reducing energy loss with a conversion efficiency exceeding 98%. This effectively minimizes energy waste during power transmission, helping customers achieve green and low-carbon goals.
2.Wide Temperature Adaptability
Equipped with an intelligent temperature control system and specially selected materials, this transformer can operate stably in extreme temperature environments ranging from -25°C to 45°C. It requires no additional maintenance and is suitable for high-cold, high-temperature, or scenarios with large temperature fluctuations.
3.Flexible Customization
The Three-phase oil-immersed power transformer supports flexible configuration of voltage ratios (e.g., 380V/220V, 415V/240V) and capacities (160KVA/200KVA). Its modular design allows for quick expansion or adjustments, adapting to the diverse needs of industrial, commercial, and new energy projects.
4.High Reliability Protection
With an IP55 protection rating and anti-vibration bracket design, it effectively resists dust, water ingress, and outdoor vibrations, extending the equipment's service life. The internal structure is optimized to reduce heat loss, significantly enhancing long-term operational stability.
5.Stringent Quality Assurance
Strictly adhering to the IEC60076 international standard, this transformer undergoes a 72-hour full-load aging test before leaving the factory. This ensures that product performance meets standards, reduces fault rates, and provides a worry-free long-term usage experience.
Installation Process of Power Transformer
1.Preliminary Planning
On-site Survey: Evaluate the installation environment (temperature, humidity, space) and load requirements, planning the transformer capacity and location.
Document Preparation: Verify equipment parameters, design drawings, and safety standards to ensure compliance with project requirements.
2.Foundation Construction
Foundation Building: Pour a concrete foundation based on the equipment weight and dimensions, reserving grounding devices and drainage channels. Ensure that the levelness error is ≤0.5%.
Safety Inspection: Confirm that the foundation's load-bearing capacity and ground resistance meet the standards.
3.Equipment Hoisting
Hoisting and Positioning: Use professional hoisting tools to place the transformer steadily on the foundation, adjust its orientation, and secure anti-vibration blocks to prevent tilting or displacement.
Tightening Check: Ensure all connecting components (bolts, brackets) are securely fastened to prevent loosening caused by vibration.
4.Electrical Connection and Testing
Wiring Configuration: Complete the connection of high and low voltage cables according to the transformer design drawings. Use insulating sleeves to protect the cables and avoid short circuits.
Insulation Testing: Test the insulation resistance of the windings with a megohmmeter, ensuring that the values meet the standards (≥100MΩ).
No-load Trial Operation: Run the transformer under no-load conditions for 2 hours, monitoring temperature, noise, and voltage fluctuations to rule out any abnormalities.
5.Acceptance and Maintenance Guidance
Load Testing: Gradually increase the load to the rated capacity, verifying stability and efficiency indicators, and recording data.
Document Delivery: Provide operation manuals, maintenance logs, and emergency handling guides, assisting customers in establishing a regular inspection mechanism.
SGS certification certificate

about us






FAQ
Q: What Are the Core Competitive Advantages of Your Company?
A: Experience and Scale: Since its establishment in 2008, our company has been focusing on the transformer field for 18 years. We have delivered over 50,000 units of equipment and served more than 2,000 customers globally.
R&D and Production: A team of 200 professionals with a 20,000㎡ modern production base covering three major locations in China: Shijiazhuang, Xingtai, and Anyang. This ensures full autonomy from raw materials to finished products.
Customization Capability: Supports the design of transformers ranging from 50kVA to 5000kVA. Customized solutions can be provided for special scenarios such as high altitude or extreme temperatures.
Q: How Do You Ensure Delivery Time and Quality?
A: Supply Chain Assurance: Leveraging the industrial cluster advantages of three factories, we maintain sufficient raw material inventory, enabling faster order response compared to the industry average by 30%.
Quality Control System: From the precision of core stacking (±0.5mm) to 200 inspection items before product delivery, we ensure that each device complies with international standards such as CE and IEC.
Q: What Is the Delivery Cycle for Standard Products? Will Custom Products Affect Delivery Time?
A: Standard Products: The typical delivery cycle is 15-30 working days (starting from the signing of the contract and receipt of the advance payment).
Custom Products: Delivery cycles may extend depending on specific requirements, usually requiring 30-60 working days. If special materials, non-standard designs, or international transportation are involved, the specific time will be negotiated between both parties.
Q: Does Your Company's Transformers Meet International Standards?
A: Certifications: Passed certifications including IEC 60076 (International Standard), GB/T 6451 (Chinese National Standard), SGS, CE, UL, etc.
Special Certifications: Non-crystalline alloy transformers meet the IEC 61786 (high-efficiency transformer) standard; pre-assembled substations comply with the IEC 62271-200 (pre-assembled substation) requirement.
Q: How to Choose the Appropriate Type of Transformer?
A: Energy Efficiency Priority: Select amorphous alloy or epoxy resin dry-type transformers.
High Load Scenarios: Oil-immersed transformers are preferable.
Complex Distribution Needs: Contact engineers to customize pre-assembled substation solutions.










